又粗又爽高潮午夜免费视频,宿主每日被guan满的日常,少洁白妇无删减全文阅读,浪小辉巨大粗爽gvvideos

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.sihainj.com/

地址:山東省濟南市章丘圣井工業(yè)園

當前位置: 首頁 > 新聞中心 > 常見問題

木工加工棚的使用功能讓人員更

來源:http://www.sihainj.com/   發(fā)布時間:2022-09-02

加工棚是建筑施工過程中操作人員或人行的必經(jīng)通道,過往人員的加工棚為雙層。從懸挑腳手架的懸挑處開始,每隔十米設(shè)置一個懸挑式加工棚,可以更好地保證加工棚下行走人員的。下面就針對木工加工棚的使用就來講講吧。
The processing shed is a necessary passage for operators or pedestrians during the construction process. The processing shed for passing personnel is double-layer. Starting from the cantilevered part of the cantilevered scaffold, a cantilevered processing shed is set every ten meters, which can better ensure the safety of people walking under the processing shed. Let's talk about the use of woodworking shed.
在施工過程中,在搭建加工棚時注意防護措施,施工人員按照施工要求進行施工,露天攪拌機位置、現(xiàn)場混凝土攪拌機、卷揚機棚、鋼筋棚、木棚、部分出入口和現(xiàn)場廁所需要設(shè)置木工加工棚。
During the construction process, pay attention to protective measures when setting up the processing shed. The construction personnel shall carry out construction according to the construction requirements. Woodworking processing shed shall be set at the location of the open-air mixer, the site concrete mixer, the hoist shed, the steel bar shed, the wood shed, some entrances and exits and the site toilet.
水平保護安裝和拆除前,進行技術(shù)交底。高空作業(yè)人員經(jīng)過技術(shù)培訓和考試,并持證上崗。加工棚使用的鋼管、扣件等材料符合JGJ130-2011《建筑施工扣件式鋼管腳手架技術(shù)規(guī)范》及相關(guān)標準的要求。
Safety technical disclosure shall be conducted before installation and removal of horizontal protection. Operators working at heights shall receive professional technical training and professional examination and take up their posts with certificates. The steel pipes, fasteners and other materials used in the processing shed meet the requirements of jgj130-2011 technical code for safety of steel tubular scaffold with fasteners in building construction and relevant standards.
安裝和拆除水平加工棚時,操作人員的“三寶”齊全并正確使用。加工棚搭設(shè)和拆除時,應(yīng)避免上下同時作業(yè),錯開作業(yè)時間。安裝和拆除加工棚時,所有材料和工具應(yīng)堆放在建筑物外緣少2m處,堆放高度不得超過1m。
When installing and removing the horizontal processing shed, the "three safety treasures" of the operators shall be complete and correctly used. During the erection and dismantling of the processing shed, it shall be avoided to operate up and down at the same time and stagger the operation time. When installing and removing the processing shed, all materials and tools shall be stacked at least 2m away from the outer edge of the building, and the stacking height shall not exceed 1m.
木工加工棚
建造和拆除加工棚時,應(yīng)在地面上設(shè)置警戒區(qū),并派專人監(jiān)控。建造和拆除加工棚時,應(yīng)指定專人指揮。管理人員應(yīng)注意眼、腿、口,采取有效的防護措施應(yīng)對危險情況,確保人員。
During the construction and demolition of the processing shed, a warning area shall be set on the ground and a special person shall be assigned to monitor it. When constructing and dismantling the processing shed, a special person shall be appointed to command. The management personnel shall pay attention to the eyes, legs and mouth, take effective safety protection measures to deal with dangerous situations and ensure personnel safety.
在雨天和大風天氣,應(yīng)暫停加工棚的搭設(shè)和拆除,并檢查和維護加工棚的質(zhì)量。加工棚搭設(shè)完成后,經(jīng)專職員驗收合格后方可投入使用。在搭設(shè)和拆除水平防護前,進行技術(shù)交底。
In rainy and windy weather, the erection and removal of processing shed shall be suspended, and the quality of processing shed shall be inspected and maintained. After the erection of the processing shed is completed, it can only be put into use after being accepted by the full-time safety officer. Before setting up and removing horizontal protection, safety technical disclosure shall be conducted.
從中我們了解到在安裝加工棚的時候一定注意施工,施工人員按照施工要求進行施工,同時還要保證搭建質(zhì)量,這樣才能實現(xiàn)保護的作用,這樣才能達到我們搭建的目的。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://www.sihainj.com咨詢了解吧。
From this, we learned that when installing the processing shed, we must pay attention to construction safety. The construction personnel must carry out construction according to the construction requirements, and at the same time, we must ensure the construction quality. Only in this way can we achieve the protection function and achieve our goal of building. For more information, please visit our website http://www.sihainj.com Consult and understand.

丰满熟女人妻大乳波多野吉衣| 帅气体育生gary网站mv软件| 玩弄高耸白嫩的乳峰a片| 老赵揉着粉嫩的双乳| 岳好紧好紧我要进去了电影| 人人澡超碰碰97碰碰碰| 久久精品国产精品亚洲| 一夜强开两女花苞| 国产精品第一页| 天堂av国产av在线av| 国产一区二区三区| 撕开奶罩揉吮奶头高潮av| 国产精品99久久久久久www| 丰满少妇被猛烈进入| 亚洲一线产区和二线产区区别| 激情五月综合色婷婷一区二区| 一性一交一口添一摸视频| 国产老色鬼无码免费视频| 亚洲欧美一区二区三区| 一女被多男玩喷潮视频免费看 | 将军猛烈顶弄h太子| 老人玩小处雌女视频| 大学生第一次破苞疼哭了| 国产av一区二区三区| 女人被躁到高潮嗷嗷叫游戏 | 青草视频在线观看| 丰满双乳秘书被老板狂揉捏| 日本最新男男gayjapan| 国产探花在线精品一区二区| 人妻人人澡人人添人人爽| 日本成熟人妻理伦无码新片 | 母亲6韩国电视剧免费观看| 57歳の熟女セックス| 50歳のバツ1熟女とハメ撮り | 黑人强开嫩模又小又紧| 裸体跳舞xxxx裸体跳舞| 久久久久夜夜夜精品国产| 欧美性做爰片免费视频看不忠| 熟睡人妻被讨厌的公侵犯| 亚洲熟妇无码一区二区三区| 乱码丰满人妻一二三区麻豆|