施工鋼筋加工棚的作用及相關(guān)案例

來(lái)源:http://www.sihainj.com/   發(fā)布時(shí)間:2022-07-19

施工鋼筋加工棚是在木工加工場(chǎng)地、鋼筋加工場(chǎng)地等上方有可能掉落物件或處于起重機(jī)調(diào)桿回轉(zhuǎn)范圍之內(nèi),應(yīng)搭設(shè)雙層防護(hù)棚。施工鋼筋加工棚就是施工現(xiàn)場(chǎng)保護(hù)施工人員,用鋼管作為支撐骨架,上面覆蓋竹串片或者竹笆板或者廢模板作為防砸,或者保護(hù)防護(hù)棚內(nèi)經(jīng)過(guò)的諸如高壓線之類的東西,一般的雙層防護(hù)是為了加大系數(shù)。
The construction reinforcement processing shed is above the woodworking processing site and reinforcement processing site, where objects may fall or are within the rotation range of the crane adjusting rod. A double-layer protective shed should be set up. The construction reinforcement processing shed is to protect the construction personnel at the construction site, use steel pipes as the support framework, and cover bamboo strips or bamboo fence boards or waste templates as anti smashing, or protect things such as high-voltage lines passing through the protective shed. The general double-layer protection is to increase the safety factor.
施工鋼筋加工棚長(zhǎng)和寬尺寸,要根據(jù)鋼筋加工數(shù)量和使用機(jī)械的多少確定加工棚的大小,一般情況有6*9m、6*12米、9*12m等幾種,可以根據(jù)實(shí)際情況酌情采用,也可自行設(shè)計(jì)長(zhǎng)寬尺寸。
The length and width of the construction reinforcement processing shed should be determined according to the number of reinforcement processing and the number of machines used. Generally, there are 6*9m, 6*12m, 9*12m and so on, which can be adopted according to the actual situation, or the length and width can be designed by ourselves.
同時(shí),現(xiàn)場(chǎng)鋼筋加工棚一般需根據(jù)施工籌備計(jì)劃,安置鋼筋對(duì)焊機(jī)、切斷機(jī)、彎曲機(jī)、調(diào)直機(jī)等設(shè)備的數(shù)量及加工流水線;另還需考慮部分鋼筋原材料、加工后鋼筋的周轉(zhuǎn)及堆放;現(xiàn)場(chǎng)施工場(chǎng)地、用電等條件來(lái)確定;故鋼筋加工棚一般跨度在12~18m,,長(zhǎng)度盡可能大于30m。
At the same time, the reinforcement processing shed on site generally needs to arrange the number of reinforcement butt welding machines, cutting machines, bending machines, straightening machines and other equipment and processing lines according to the construction preparation plan; In addition, it is also necessary to consider the turnover and stacking of some reinforcement raw materials and processed reinforcement; On site construction site, electricity and other conditions; Therefore, the reinforcement processing shed generally has a span of 12~18m and a length of more than 30m as far as possible.
鋼筋加工棚
Reinforcement processing shed case:
立柱:采用150mmX150mmX3mm方鋼管,中心間距4.15m,立柱焊接滿焊地面預(yù)埋鋼板上,立柱高3.2m,鋼筋棚立柱用方鋼管噴涂雙色漆,底漆使用防銹漆一遍,面漆使用黃、黑兩種漆,自底部刷黑漆,向上每間隔50cm交替使用黃、黑漆,共刷兩遍。
Column: 150mmx150mmx3mm square steel pipe is used, with a center spacing of 4.15M. The column is fully welded to the ground embedded steel plate, and the column height is 3.2m. The column of the reinforcement shed is sprayed with two-color paint with square steel pipe, one coat of antirust paint is used for the primer, and two coats of yellow and black paint are used for the finish. Black paint is applied from the bottom, and yellow and black paint are applied alternately every 50cm upward, a total of two coats.
支架:橫向采用40mmX60mmX3.5mm方鋼管,跨度12m(兩端各懸挑1m),與立柱焊接,支架與立柱斜撐使用40mmX60mm方鋼管連接,支架與屋頂脊梁連接使用40mmX60mmX3.5mm方鋼管,支架底漆使用防銹漆--遍,面漆使用鐵紅漆兩遍。
Support: 40mmx60mmx3.5mm square steel pipe is used horizontally, with a span of 12m (1m overhanging at both ends). It is welded with the column. 40mmx60mm square steel pipe is used to connect the support with the column diagonal brace, 40mmx60mmx3.5mm square steel pipe is used to connect the support with the roof ridge, antirust paint is used for the primer of the support, and iron red paint is used for the surface paint twice.
脊梁:橫向采用40mmX60mmX3.5mm方鋼管,與立柱、支架焊接,并兩端做懸挑,懸挑長(zhǎng)度20cm。縱向采用C型鋼50mmX80mm,共11道,刷漆兩道,底漆使用防銹漆-遍,面漆使用鐵紅漆兩遍。
Spine: 40mmx60mmx3.5mm square steel pipes are used horizontally, welded with columns and supports, and cantilever is made at both ends, with a cantilever length of 20cm. C-shaped steel 50mmx80mm is used longitudinally, a total of 11 courses, two coats of paint, one coat of antirust paint for primer and two coats of iron red paint for finish.
施工鋼筋加工棚的作用及相關(guān)案例的問題就講解完畢了,您有需求或者有問題的話可關(guān)注我們網(wǎng)站http://www.sihainj.com隨時(shí)來(lái)向在線客服咨詢了解。
The role of the construction reinforcement processing shed and the problems of relevant cases are explained. If you have needs or problems, you can follow our website http://www.sihainj.com Feel free to consult online customer service.

唐舞桐灌满jing液h斗罗h| 丫鬟露出双乳让老爷玩弄| 荡公乱妇11部分| hd女人奶水授乳milk| 亚洲精品无码高潮喷水在线| 男人床上越折腾你是不是越爱你 | av天堂午夜精品蜜臀av| 偷偷藏不住小说免费阅读| 婷婷综合亚洲爱久久| 男人放进女人阳道视频观看| 小受被用各种姿势进入n视频| 高潮videossex潮喷另类| 亚洲毛片| 亚洲hairy多毛pics大全| 欧美视频| 扒开腿狂躁女人视频免费| 大又大粗又爽又黄少妇毛片| 麻豆亚洲av熟女国产一区二| 女人下边被添全过视频| 撕开奶罩揉吮奶头高潮av| 亚洲精品久久久久一区二区| 偷看农村女人做爰毛片色| 欧美高清videossexo| 无码人妻精品一区二区三区夜夜嗨| 波多野结衣高清无碼中文字幕| 日日摸日日碰夜夜爽无码亚洲v| 成人激情五月天| 极品人妻洗澡后被朋友玩| 同桌上课脱裙子让我帮他自慰| 国产午夜精品一区二区三区嫩草| 老板把我抱到办公室揉我胸视频| 国产第一页浮力影院| 免费无码又爽又刺激a片涩涩软件| 灯草和尚在线观看| 欧美乱码一二三四区| 888影视网| 啦啦啦高清在线观看www| 免费看国产曰批40分钟无码| 精品人妻伦九区久久aaa片69| 在线观看视频| 小短文h啪纯肉公交车|